0495 007 755 info@arkhouses.com.au Central Coast, Newcastle & Hunter

Renovation · main bathroom

A separate bathroom and WC became one generous family bathroom.

This Lisarow renovation opened the former main bathroom and adjoining WC into a single room, then rebuilt it with a freestanding bath, frameless shower, wall-hung vanity, full-height tiling and coordinated black fittings.

Location
Lisarow, NSW
Scope
Main bathroom + WC
Home
Single-storey residence

Two compact rooms were reorganised as one complete bathroom.

The original plan divided the main bathroom and WC into two narrow spaces. The bathroom contained a corner shower, built-in bath and small vanity, while the toilet occupied a separate room beside the laundry. Strip-out exposed the shared wall, services and ceiling so the area could be planned as one larger wet room.

The completed bathroom retains both external windows and brings the bath, shower, toilet and vanity together. Large-format marble-look wall tiles, dark floor tiles, black fittings, recessed storage and two niches create a consistent finish. Lighting, ventilation, a heated towel rail and the adjoining laundry floor tiling were coordinated within the same scope.

  • Main bathroom and separate WC opened into one room
  • Complete strip-out, floor preparation and new ceiling
  • Insulation, wet-area wall linings and membrane
  • Full-height wall tiling and coordinated dark floor tiles
  • Freestanding corner bath, frameless shower and recessed niches
  • Wall-hung vanity, recessed mirrored cabinet and back-to-wall toilet
  • Black tapware, heated towel rail, downlights and ventilation
  • Laundry floor tiling, architraves, painting and final close-out

Two narrow spaces became one complete family bathroom.

Move the gold divider across each photograph to compare the original rooms with the completed bathroom.

The bath, vanity and toilet now share one open room

The original bath and small vanity occupied a narrow bathroom beside a separate WC. Opening the two spaces created room for a freestanding bath, wall-hung vanity and toilet, while both external windows were retained.

Before
Built-in bath and small vanity before the Lisarow bathroom renovation
After
Freestanding bath and wall-hung vanity after the Lisarow bathroom renovation

More storage without crowding the floor

The former floor-mounted vanity and plain mirror were replaced with a wall-hung vanity, vessel basin and recessed mirrored cabinet. Clear floor space and reflected light help the larger room feel open and ordered.

Before
Floor-mounted vanity before the Lisarow bathroom renovation
After
Wall-hung vanity and recessed mirrored cabinet after the Lisarow renovation

Frameless glass replaces the enclosed corner cubicle

The former framed shower was stripped back and rebuilt with full-height tiling, a recessed niche, dark floor tiles and a coordinated overhead and handheld shower. Clear glass keeps the shower connected to the rest of the room.

Before
Framed corner shower before the Lisarow bathroom renovation
After
Frameless shower with black fittings after the Lisarow bathroom renovation

The toilet is now part of the main bathroom

The separate WC was absorbed into the new layout. Its replacement sits within the fully tiled bathroom, with a relocated water point and matching black accessory fittings.

Before
Separate WC before the Lisarow bathroom renovation
After
Back-to-wall toilet integrated into the completed Lisarow bathroom

The opened layout and wet-area stages were recorded.

Progress photographs show the work that is concealed by the completed ceiling, wall tiles, floor tiles and fixtures.

Main bathroom and WC stripped out during the Lisarow renovation

Strip-out and opened layout

The former fixtures, finishes and internal division were removed so the combined room, floor and service routes could be assessed before rebuilding.

Framing, insulation and niche set-out during the Lisarow bathroom renovation

Framing and niche set-out

Insulation, framing and the recessed storage positions were coordinated before the wet-area wall linings enclosed the structure.

Shower membrane and recessed niche during the Lisarow bathroom renovation

Shower membrane

The shower base, wall junctions, service penetrations and recessed niche were photographed before the tiled finish concealed them.

Wet-area wall linings and recessed cabinet set-out during the Lisarow renovation

Wall linings and storage

The new wall linings, recessed mirrored cabinet opening and fixture positions were checked before full-height tiling began.

The supplied plan records the original two-room arrangement.

The existing plan shows the main bathroom beside a separate WC and the laundry. It provides clear context for opening the bathroom and WC into one more usable family bathroom.

Existing single-storey floor plan showing the original bathroom and separate WC
Floor plan of the Lisarow home showing the main bathroom beside a separate WC and laundry