Renovation · bathrooms & flooring

Two wet areas and new flooring, renewed as one coordinated project.

A practical Castle Hill renovation combining the main bathroom and ensuite rebuilds with preparation and installation of new sheet vinyl flooring throughout the home.

Location
Castle Hill, NSW
Scope
Bathroom + ensuite + floors
Home
Single storey

Wet-area renewal and flooring coordinated across one occupied home.

The work brought together two detailed bathroom renovations and a broader flooring upgrade. Coordinating the scopes allowed the floor preparation, wet-area thresholds, skirtings and final finishes to be resolved as one continuous project.

Both bathrooms were stripped back so the existing substrates and service locations could be checked. The rooms were then rebuilt with new wall linings, waterproofing, tiling, shower enclosures, vanities, toilets and fittings. Carpet was removed elsewhere in the home before the concrete was patched and new sheet vinyl flooring and skirtings were installed.

  • Strip-out and preparation of the main bathroom and ensuite
  • Wet-area wall linings and waterproofing to AS 3740 and NCC requirements
  • Floor, wall and skirting tiles with new shower enclosures and fixtures
  • Carpet removal and concrete floor repairs
  • Sheet vinyl flooring and new skirtings throughout the home

The original rooms, rebuilding stages and completed finishes shown together.

Move the gold divider across each photograph to compare the relevant stage of work with the completed finish.

Main bathroom

The original bathroom had a retained bath with low wall tiling and older fittings. The room was opened up around the bath and shower positions so the substrate, wall linings and service points could be prepared before waterproofing and tiling. The completed room uses a restrained neutral palette, a renewed bath surround and contemporary fixtures.

Before
Main bathroom before renovation in Castle Hill
After
Main bathroom after renovation in Castle Hill

Main bathroom vanity

The original vanity, mirror and tapware were replaced with a cleaner, more compact arrangement. A new two-door vanity, square mixer, streamlined mirror and updated accessories give the entry side of the bathroom a lighter and more practical finish.

Before
Main bathroom vanity before renovation in Castle Hill
After
Main bathroom vanity after renovation in Castle Hill

Ensuite shower

The original shower had an older sliding enclosure, low wall tiling and dated fittings. It was rebuilt with a fully framed sliding enclosure, new shower rail and mixer, large-format light wall tiles and warm grey floor tiles for a cleaner, more cohesive finish.

Before
Ensuite shower before renovation in Castle Hill
After
Ensuite after renovation in Castle Hill

Ensuite vanity

The second vanity was renewed with a wider storage cabinet, integrated basin, single-lever mixer and a streamlined mirror. The new wall tiling and coordinated grey floor finish connect the vanity area visually with the adjoining shower and toilet zones.

Before
Ensuite vanity before renovation in Castle Hill
After
Ensuite vanity after renovation in Castle Hill

Wet-area floor transitions

The original grey floor tiles stopped and restarted across the connected bathroom spaces. The renewed layout uses a consistent light tile through the circulation area, with carefully resolved thresholds into the adjoining wet zones and existing hallway finish.

Before
Wet-area floor transitions before renovation in Castle Hill
After
Coordinated wet-area floor transitions after renovation in Castle Hill

Sheet vinyl flooring

After the existing carpet was removed, the concrete floor was patched and levelled where required. The new timber-look sheet vinyl creates a continuous, easy-care surface through bedrooms and living areas, with junctions and skirtings completed around the retained tiled zones.

Before
Original carpet before the flooring renovation in Castle Hill
After
New sheet vinyl flooring after renovation in Castle Hill

Preparation and waterproofing recorded before concealment.

The photographs document the work that supports the visible finish, including substrate preparation, shower-base detailing and continuous wet-area membranes.

Main bathroom during strip-out in the Castle Hill renovation

Main bathroom strip-out

The retained bath and exposed substrates recorded before new linings, waterproofing and finishes were installed.

Ensuite during strip-out in the Castle Hill renovation

Ensuite strip-out

The opened ensuite recorded while existing finishes were removed and the shower, wall linings and service points were prepared for rebuilding.

Main bathroom waterproofing during the Castle Hill renovation

Main bathroom

Continuous waterproofing across the wet-area floor and upturns around adjoining walls, openings and the bath zone.

Ensuite shower base before waterproofing during the Castle Hill renovation

Ensuite

Shower-base, wall-lining and threshold preparation recorded before the membrane, tiles and framed enclosure were installed.

One level, with the renovated wet areas grouped near the centre of the home.

The main bathroom and ensuite sit beside the family area, while the flooring work extends through the surrounding bedrooms and living spaces.

Single-storey floor plan
Floor plan of the Castle Hill home showing the main bathroom and ensuite