0495 007 755 info@arkhouses.com.au Sydney, Central Coast, Newcastle & Hunter

Renovation · wet areas, kitchen & interiors

One coordinated renovation across both levels.

This Cronulla home was renewed as one connected project, including the main bathroom, ensuite, powder room and kitchen, plus bedroom windows and flooring, hallway and study access, and staircase refinishing.

Location
Cronulla, NSW
Scope
Wet areas + kitchen + interiors
Home
Two-storey home

A complete interior renewal across both levels.

This two-storey Cronulla home was renovated from its busiest rooms through to the connecting spaces. We rebuilt the main bathroom, ensuite and downstairs powder room, renewed the kitchen and carried the improvements into the bedrooms, hallway, study entrance and staircase.

The work included new bedroom flooring and windows, new architraves fitted and painted around the openings, a reconfigured entrance to the study and replacement hallway flooring. The staircase balustrade was stripped and repainted, and the surrounding stairwell opening was repaired and refreshed. Completing the work as one project created a consistent finish throughout the home and allowed every trade to be sequenced efficiently.

  • Main bathroom, ensuite and downstairs powder room rebuilt
  • Kitchen benchtops, splashbacks and sink-area finishes renewed
  • Bedroom flooring and windows replaced
  • New bedroom window architraves fitted and painted
  • Study entrance reconfigured and hallway flooring replaced
  • Staircase balustrade stripped back and repainted
  • Stairwell opening, electrical fit-off, ventilation and final finishes completed
  • Trade sequencing and final completion coordinated across both levels

The home's most-used rooms, rebuilt for everyday life.

Move the gold divider across each photograph to compare the original condition with the completed work.

Main bathroom

The original segmented room was rebuilt with full-height large-format tiling, a new bath and glazed shower, recessed storage, a double vanity and updated fittings.

Before
Main bathroom shower and vanity before renovation in Cronulla
After
Main bathroom shower and double vanity after renovation in Cronulla

Bath and toilet zone. This second comparison shows the rebuilt bath, glazing, tiled niche and window-side detailing.

Before
Main bathroom bath and toilet zone before renovation in Cronulla
After
Main bathroom bath and toilet zone after renovation in Cronulla

Ensuite

The ensuite was rebuilt with full-height tiling, a glazed shower enclosure, tiled niche, double vanity, coordinated mirrors and lighting, and updated fittings.

Before
Ensuite vanity and window before renovation in Cronulla
After
Ensuite double vanity and window after renovation in Cronulla

Shower and toilet zone. This second comparison shows the rebuilt shower enclosure, tiled niche, toilet and window-side detailing.

Before
Ensuite shower and toilet zone before renovation in Cronulla
After
Ensuite shower and toilet zone after renovation in Cronulla

Downstairs powder room

The downstairs powder room was rebuilt with full-height neutral tiling, a back-to-wall toilet, storage vanity, round mirror and new lighting.

Before
Downstairs powder room before renovation in Cronulla
After
Downstairs powder room after renovation in Cronulla

Kitchen

The existing cabinet layout was retained and renewed with new stone-look benchtops, tiled splashbacks, updated sink-area finishes and carefully resolved junctions around the windows, appliances and joinery.

Before / early works
Kitchen during early renovation work in Cronulla
After
Kitchen after renovation in Cronulla

Sink and window zone. This second comparison shows the renewed benchtop, sink, splashback and window junction after the opened wall was rebuilt and finished.

Before / strip-out
Kitchen sink and window wall during strip-out in Cronulla
After
Kitchen sink and window wall after renovation in Cronulla

The renovation continued through the bedrooms, hallway and staircase.

The work did not stop at the kitchen and wet areas. These preparation photographs show the bedrooms, hallway and staircase before their flooring, window, access and finishing work was completed.

Before / preparation
Cronulla bedroom before flooring and window works, with surfaces protected
After
Renovated Cronulla bedroom with new flooring, replacement windows and painted architraves

Bedroom

New flooring and replacement windows refreshed the room. New architraves were fitted and painted around each opening for a consistent finish.

Before / preparation
Cronulla upper hallway before the study entrance and flooring works
After
Cronulla hallway with a reconfigured study entrance and new flooring

Hallway and study entry

The entrance to the study was reconfigured to improve the connection from the hallway. New flooring then created a cleaner, more continuous transition between the spaces.

Before / preparation
Cronulla master bedroom before flooring and window works, with surfaces protected
After
Renovated Cronulla master bedroom with new flooring, replacement windows and painted architraves

Master bedroom

The master bedroom received the same coordinated upgrade, with new flooring, replacement windows, and new architraves fitted and painted to complete the openings.

Before / preparation
Cronulla staircase and balustrade before stripping and repainting
After
Refinished staircase balustrade and refreshed stairwell opening in Cronulla

Staircase

The balustrade was stripped back to remove the existing coating before being fully repainted. The surrounding stairwell opening was repaired and refreshed to complete the transition between levels.

Waterproofing was documented before it was concealed.

The wet areas were opened up, rebuilt and photographed through the waterproofing stage. These records show the work behind the completed tiling and fixtures.

Main bathroom waterproofing during the Cronulla renovation

Main bathroom

Waterproofing around the bath, shower base, floor wastes and wall junctions before tiling.

Ensuite waterproofing during the Cronulla renovation

Ensuite

Continuous membrane installation across the shower base and surrounding wet-area floor.

Downstairs powder room waterproofing during the Cronulla renovation

Downstairs powder room

Floor and perimeter waterproofing recorded before wall linings and finishes were completed.

How the completed work was distributed across both levels.

The ground floor includes the kitchen, powder room, hallway, study entrance and staircase. The upper floor includes the main bathroom, ensuite, bedrooms and upper stair opening.

Ground floor plan
Ground floor plan of the Cronulla home showing the kitchen, powder room, hallway, study entrance and staircase
Upper floor plan
Upper floor plan of the Cronulla home showing the bathrooms, bedrooms and upper stair opening